Use
of steel fibers instead of rebar allowed the top of this dome
to cave in twice during construction. To repair this dome, we
installed a rebar grid covered with welded wire fabric and re-sprayed
both the urethane and shotcrete.
177
Dome Park Place - Italy, TX 76651
Tel (972)483-7423 - Fax (972)483-6662 | Press Room