David and Mike South traveled to Beggs, Oklahoma to check the progress on the Monolithic Domes being constructed for Beggs ISD. David was impressed with the classroom design. He said, "The 16-foot ceilings make for a great educational setting." David reports that construction is moving along at a steady pace.

The 112' diameter dome, on a 12' foot Orion wall is expected to be in operation by the end of July 2005. It will provide 9 additional classrooms, offices and a student commons area. The gymnasium will be done February 2006.